 You can also follow the progress of council's major regional projects.


29 results found

Subpages

    Alexandra Headland, Boolarong Crescent - Pathway renewal

    Alexandra Headland

    Sunshine Coast Council is committed to increasing and maintaining pathway networks across our region.

    Start Date
    Duration3 weeks

    Construction will start soon on renewing the existing footpath along Boolarong Crescent and Mayfield Street, Alexandra Headland. 

    A total length of 230 metres of path will be replaced. 

    Alexandra Headland - Boolarong Crescent | H9878 - Pathway renewal project news - Division 4 (PDF, 588KB)

    Bald Knob, Bald Knob Road - Culvert rehabilitation

    Bald Knob

    Sunshine Coast Council is committed to the continual renewal and upgrade of the underground stormwater network within our region.

    Start Date
    Duration8 weeks

    Council will soon undertake works to remove damaged underground stormwater infrastructure and install new underground pipes, stormwater pits, manhole, rock channel and retaining wall at the property adjacent to 954 Bald Knob Road, Bald Knob.

    Bald Knob - Bald Knob Road | K3857 - Culvert rehabilitation project news - Division 5 (PDF, 806KB)

    Buderim, Dixon Road - Footpath renewal

    Buderim

    Sunshine Coast Council is committed to increasing and maintaining our road infrastructure across our region.

    Start Date
    Duration3 weeks

    Construction will begin soon on the renewal of 440 metres of footpath on the East side of Dixon Road from Nyes Crescent to number 71 Dixon Road, Buderim. 

    Buderim - Dixon Road | H4650 - Footpath renewal project news - Division 6 (PDF, 1.2MB)

    Buderim, Falkland Court - Stormwater pit upgrade

    Buderim

    Sunshine Coast Council is committed to maintaining infrastructure across our region.

    Start Date
    Duration1 week

    As part of this year’s Stormwater Renewal Program, Council is upgrading two stormwater assets on Falkland Court, Buderim. 

    Buderim - Falkland Court | K6623 - Stormwater pit upgrade project news - Division 7 (PDF, 591KB)

    Buderim, Forestwood Drive - New pump track

    Buderim

    As part of these ongoing improvements, we are constructing a new pump track in Forestwood Drive Park, Buderim.

    Start Date
    Duration2 months

    In September 2023, we invited community feedback on the best location for a pump track and received support to build the track at Forestwood Drive Park.

    For more information around the community engagement process please visit Council’s Have Your Say page.

    Buderim - Forestwood Drive | K4015 - New pump track project news - Division 7 (PDF, 743KB)

    Buderim, Wren Crescent - Stormwater pit upgrades

    Buderim

    Sunshine Coast Council is committed to maintaining infrastructure across our region.

    Start Date
    Duration1 week

    As part of this year’s Stormwater Renewal Program, Council is upgrading one stormwater asset along Wren Crescent, Buderim. 

    Buderim - Wren Crescent | K6623 - Stormwater pit upgrades project news - Division 6 (PDF, 592KB)

    Buderim, Yindi Street - Stormwater pit upgrades

    Buderim

    Sunshine Coast Council is committed to maintaining infrastructure across our region.

    Start Date
    Duration1 week

    As part of this year’s Stormwater Renewal Program, Council is upgrading one stormwater asset along Yindi Street, Buderim.

    Buderim - Yindi Street | K6623 - Stormwater pit upgrades project news - Division 7 (PDF, 622KB)

    Coolum Beach, Fauna Terrace - Outlet upgrade

    Coolum Beach

    Sunshine Coast Council is committed to the continual renewal and upgrade of the stormwater network within our region.

    Start Date
    Duration5 weeks

    Council will soon start works to remove damaged stormwater infrastructure at Fauna Terrace, Coolum.

    The works will also include installing new underground pipes, headwall, piers, rock protection and gabion mattress.

    Coolum Beach - Fauna Terrace | K3479 - Outlet upgrade project news - Division 9 (PDF, 796KB)

    Coolum Beach, Greenoaks Drive - Stormwater pit upgrades

    Coolum Beach

    Sunshine Coast Council is committed to maintaining infrastructure across our region.

    Start Date
    Duration1 week

    As part of this year’s Stormwater Renewal Program, Council is upgrading one stormwater asset on Greenoaks Drive, Coolum Beach.

    Coolum Beach - Greenoaks Drive | K6623 - Stormwater pit upgrades project news -Division 9 (PDF, 654KB)

    Currimundi, Westaway Parade - Pathway fence renewal

    Currimundi

    As a result of natural erosion, the Currimundi Lake embankment has subsided and a section of the existing timber post and rail fence has collapsed. This area has deteriorated further through unintended public access.

    Start Date
    Duration5 weeks

    We are planning to realign the path and provide barrier fencing where required. This will allow for the lake bank to be stabilised and rehabilitated as part of a future bank works.

    Currimundi - Westaway Parade | K7379 - Pathway fence renewal project news - Division 3 (PDF, 550KB)

    Eudlo, Logwoods Road and Perrins Road - Gravel road upgrade

    Eudlo

    Sunshine Coast Council will soon start construction on upgrading sections of Logwoods Road and Perrins Road, Eudlo.

    Start Date
    Duration6 months

    Upgrades along Perrins Road will extend approximately 500 metres south from the intersection of Logwoods Road to the existing sealed section. Works on Logwoods Road will extend pproximately 450 metres west from the intersection of Perrins Road to the existing sealed section. 

    Works will include sealing and culvert upgrades to improve dust suppression and safety for all road users. 

    Eudlo -  Logwoods Road and Perrins Road | K1487 / H4588 - Gravel road upgrade project news - Division 5 (PDF, 745KB)

    Eumundi, Seib Road - New pedestrian bridge

    Eumundi

    Construction will soon start on a new pedestrian bridge and boardwalk over the North Maroochy River at Eumundi.

    Start Date
    Duration6 months

    Running next to the existing road bridge on the southern side of Eumundi-Noosa Road, this new three-metre-wide pedestrian bridge, pathway and boardwalk will be separate from vehicles. It will provide a safer pedestrian link between Seib Road and Albert Street, Eumundi. 

    Council partnered with the Department of Transport and Main Roads throughout the design and construction phases of this project. 

    The Australian and Queensland Governments have funded the $6 million project under a 50-50 split, as part of the Road Safety Program.

    Eumundi - Seib Road | H4730 - New pedestrian bridge project news - Division 10 (PDF, 1.2MB) 

    Golden Beach, Landsborough Parade - Bevan Henzell bridge steel footway

    Golden Beach

    Council will soon refurbish the Bevan Henzell bridge cantilever walkway.

    Start Date
    Duration5 months

    Work will include the removal of the walkway, renewal of the framework and replacement of the balustrade and decking.

    Kawana Aquatic Centre - Upgrade

    Bokarina, Kawana

    Major upgrades are underway for Kawana Aquatic Centre and the facility remains fully operational during this time.

    Start Date
    DurationOngoing

    Major upgrades are underway for Kawana Aquatic Centre and the facility remains fully operational during this time.

    Stage 1 of the aquatic centre upgrade is complete, including a new 20-metre, five-lane indoor heated pool along with new structures, new plant and equipment and demolition of the existing indoor pool.

    Construction of Stage 2 is now underway and is scheduled for completion in late 2025, weather permitting.

    These works include a new entry building, a kiosk, public amenities and changerooms, and additional car parking.

    Bokarina - Kawana Aquatic Centre | H7797 Stage 1 completion April 2024 project news - Division 3 (PDF, 584KB)

    Bokarina - Kawana Aquatic Centre | H7797 Stage 1 update October 2023 project news - Division 3 (PDF, 550KB)

    Kiamba, Kiamba Road - Bridge replacement

    Kiamba

    Council is committed to maintaining infrastructure across our regions.

    Start Date
    Duration3 months

    Work will soon commence on the replacement of the Kiamba Road timber bridge. The existing bridge and some elements of the bridge piles will be replaced with a similar timber structure.

    The new bridge is being constructed off site and will be lifted into position to reduce the interruption to traffic.

    Kiamba - Kiamba Road | H4586 - Bridge replacement project news - Division 10 (PDF, 492KB)

    Marcoola, Mudjimba Esplanade - Bus stop crossing

    Marcoola

    Sunshine Coast Council is committed to improving accessibility throughout our footpath network.

    Start Date
    Duration2 weeks

    We will be installing a new pedestrian refuge along Mudjimba Esplanade, Mudjimba. 

    This will greatly improve pedestrian safety and accessibility for our community crossing from the beach to the bus stop, amenities and skate park. 

    Three carparks will be lost on the eastern side of Mudjimba Esplanade to allow for the crossing to meet pedestrian safety standards. 

    Marcoola - Mudjimba Esplanade | K6216 - Bus stop crossing project news - Division 8 (PDF, 522KB)